Image from Google Jackets

Code of practice for the selection of subcontractors.

By: Language: English Series: Working Group ; 3Publication details: London Thomas Telford 1997Description: 27p. ; 30cmISBN:
  • 0727725424
  • 0727725432
Subject(s): LOC classification:
  • 692.8
Summary: CIB was set up under the chairmanship of Sir Michael Latham to implement the recommendations of the Latham Report Constructing the Team. This code deals with the selection of subcontractors by main contractors and the selection of sub-subcontractors by subcontractors with particular emphasis on competitive tendering.
Holdings
Item type Current library Call number Copy number Status Barcode
Book London Folio F692.8 (Browse shelf(Opens below)) 1 Available 30065877

CIB was set up under the chairmanship of Sir Michael Latham to implement the recommendations of the Latham Report Constructing the Team. This code deals with the selection of subcontractors by main contractors and the selection of sub-subcontractors by subcontractors with particular emphasis on competitive tendering.