Image from Google Jackets

Pre-contract control

By: Language: English Summary: In RICS Quantity Surveyors` Division. Control of building projects: co-operation or conflict. One-day conference (Organised by) RICS, SCALA and CIPFA (at RICS) 17th October 1984. (Paper 1). 1984/55 ABC
Holdings
Item type Current library Call number Copy number Status Barcode
Reference material London RICS Boxes RICS 1984/55 (Browse shelf(Opens below)) 1 Available 96992-1001

In RICS Quantity Surveyors` Division. Control of building projects: co-operation or conflict. One-day conference (Organised by) RICS, SCALA and CIPFA (at RICS) 17th October 1984. (Paper 1). 1984/55 ABC