Prefabricated housing in the UK: a case study - CASPAR II, Leeds Part 2
Bagenholm, C.
Prefabricated housing in the UK: a case study - CASPAR II, Leeds Part 2 - London CRC Ltd 2001 - 6p. ill. 30cm. - BRE Information Paper 16/01 .
This Information Paper is in three parts: Parts 1 & 2 describe two case studies and Part 3 summarises the project. For Part 1 see: 1860814956; and for Part 3 see: 1860814972
1860814964
PRE-FABRICATION
PRE-FABRICATED MATERIALS
HOUSING
MODULAR CONSTRUCTION
693.97
Prefabricated housing in the UK: a case study - CASPAR II, Leeds Part 2 - London CRC Ltd 2001 - 6p. ill. 30cm. - BRE Information Paper 16/01 .
This Information Paper is in three parts: Parts 1 & 2 describe two case studies and Part 3 summarises the project. For Part 1 see: 1860814956; and for Part 3 see: 1860814972
1860814964
PRE-FABRICATION
PRE-FABRICATED MATERIALS
HOUSING
MODULAR CONSTRUCTION
693.97