Determining wind actions using Eurocode 1 Part 2 Worked examples - wind loads on a two-storey house and 128 m tower
Blackmore, Paul
Determining wind actions using Eurocode 1 Part 2 Worked examples - wind loads on a two-storey house and 128 m tower - Watford BRE 2015 - 16p. ill. 30cm. - BRE Digest (DG 436-2) .
Demonstrates the calculation procedure for determining wind loads and includes example calculations for a two-storey house and a 120 m residential tower on a two-storey (8 m) podium. This is the second part of a three-part Digest giving guidance on the use of Eurocode 1 (BS EN 1991-1-4). This update to Part 2 replaces the guidance published in 1999.
Advanced
9781848064249
EUROCODE 1
WIND LOADING
WIND CONTROL
PEAK VELOCITY PRESSURE
United Kingdom--
690 $2 18
Determining wind actions using Eurocode 1 Part 2 Worked examples - wind loads on a two-storey house and 128 m tower - Watford BRE 2015 - 16p. ill. 30cm. - BRE Digest (DG 436-2) .
Demonstrates the calculation procedure for determining wind loads and includes example calculations for a two-storey house and a 120 m residential tower on a two-storey (8 m) podium. This is the second part of a three-part Digest giving guidance on the use of Eurocode 1 (BS EN 1991-1-4). This update to Part 2 replaces the guidance published in 1999.
Advanced
9781848064249
EUROCODE 1
WIND LOADING
WIND CONTROL
PEAK VELOCITY PRESSURE
United Kingdom--
690 $2 18