Factors of construction time [electronic resource] Construction cost vs. gross floor area

Choudhury, Ifte

Factors of construction time Construction cost vs. gross floor area [electronic resource] - London RICS 2013 - COBRA 2013 .

A paper presented at the COBRA Conference in New Delhi on 10-12 September 2013. Showes a statistically significant relationship between construction time and magnitude of the project, measured by gross floor area, at the level of significance (p-value) of < 0.0001. This variable, when introduced in the model, presumably acts as a proxy for actual construction cost. Construction type did not have a statistically significant relationship with construction time. A prediction model of construction time has been developed based on the results of the study.

9781783210305


CONSTRUCTION AND BUILDING RESEARCH CONFERENCE (COBRA)
TIME RELATED COSTS
PROJECT COSTS
CONSTRUCTION TIME


India