High-rise repair scheme
High-rise repair scheme
- 1987
- Construction News no 5998, 22/1/87 p1 .
Leeds City Council is to carry out a pilot strengthening and repair scheme on one of its 24 high-rise Reema blocks to see if the buildings can be made safe at a reasonable cost.
BUILDING DEFECTS
HIGH RISE BUILDINGS
PREFABRICATION
REPAIRS
SYSTEM BUILDING
Leeds City Council is to carry out a pilot strengthening and repair scheme on one of its 24 high-rise Reema blocks to see if the buildings can be made safe at a reasonable cost.
BUILDING DEFECTS
HIGH RISE BUILDINGS
PREFABRICATION
REPAIRS
SYSTEM BUILDING