Refurbishment
Robery, P.C.
Refurbishment - 1992 - Construction Maintenance & Repair 6(3) may/June 1992, 17-20(4) .
Outlines a strategy for tackling the problems of refurbishment from the project planning stage, through the structural and architectural assessment, to the refurbishment work itself. Looks in some detail at requirements of the COSHH regulations.
MANAGEMENT-HEALTH AND SAFETY-HAZARDOUS SUBSTANCES-ASBESTOS
CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH
DISINFECTANTS
LOADINGS
PAINT
RADIATION
SOOTS
THERMOMETERS
Refurbishment - 1992 - Construction Maintenance & Repair 6(3) may/June 1992, 17-20(4) .
Outlines a strategy for tackling the problems of refurbishment from the project planning stage, through the structural and architectural assessment, to the refurbishment work itself. Looks in some detail at requirements of the COSHH regulations.
MANAGEMENT-HEALTH AND SAFETY-HAZARDOUS SUBSTANCES-ASBESTOS
CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH
DISINFECTANTS
LOADINGS
PAINT
RADIATION
SOOTS
THERMOMETERS