Prefab treatment for Tube
Prefab treatment for Tube
- 1997
- Building Design (1300) 21 March 1997, 4(1) .
Using prefabricated units for London Underground stations would cut construction costs by 30% according to a London Transport study.
CONSTRUCTION COSTS
LONDON UNDERGROUND
PREFABRICATED BUILDINGS
TRANSPORTATION
Using prefabricated units for London Underground stations would cut construction costs by 30% according to a London Transport study.
CONSTRUCTION COSTS
LONDON UNDERGROUND
PREFABRICATED BUILDINGS
TRANSPORTATION