Managing design change
Chapman, R.
Managing design change - 1997 - Architects` Journal 205(24) 19 June 1997, 47-49(3) .
Advocates that building the capacity to deal with change in design into a project at the outset will save a lot of difficulities in the longrun.
CHANGE CONTROL
CLIENT BRIEFS
DESIGN CHANGE
Managing design change - 1997 - Architects` Journal 205(24) 19 June 1997, 47-49(3) .
Advocates that building the capacity to deal with change in design into a project at the outset will save a lot of difficulities in the longrun.
CHANGE CONTROL
CLIENT BRIEFS
DESIGN CHANGE