Specifier off-site manufacture
Specifier off-site manufacture
- 2005
- Building 270(8390) 15 July 2005, 62-72(8) .
Looks at the redevelopment of a grade II listed former bingo hall into apartments using a hanging design to avoid disturbing the auditorium with its highly decorative ceiling that needed to be preserved in its entirety. Also the off-site solutions used in constructing a cedar-framed family house. Includes advice on specifying steel frames and the latest products.
Looks at the redevelopment of a grade II listed former bingo hall into apartments using a hanging design to avoid disturbing the auditorium with its highly decorative ceiling that needed to be preserved in its entirety. Also the off-site solutions used in constructing a cedar-framed family house. Includes advice on specifying steel frames and the latest products.