In good form

Bishop, Phil

In good form - 2006 - Contract Journal 434(6582) 5 July 2006, 24-25(2) .

Examines how the Work at Height Regulations 2005 and other health and safety measures have led to a strong increase in demand for formwork systems that can be constructed from below rather than above. Looks at some of the new products that have been developed in response to this demand, and the information and training offered to ensure they are used correctly on site.


WORK AT HEIGHT REGULATIONS 2005
MANUAL HANDLING OPERATIONS REGULATIONS 1992
CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 1994
LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998


GREAT BRITAIN