Cost implications resulting from proposed change to metric: interim report of study group W,Quantity Surveyors section of the London (North West) Branch, March 1970

Cost implications resulting from proposed change to metric: interim report of study group W,Quantity Surveyors section of the London (North West) Branch, March 1970 - RICS 1970 - 7p

Filed in box 1970/16A

389.152