A price on design. Production based design cost modelling in design and build organisations.
A price on design. Production based design cost modelling in design and build organisations.
- London RICS 1998
A report on research funded by the Education Trust of the Royal Institution of Chartered Surveyors by Andrew Ross, School of the Built Environment, Liverpool John Moores University.
0854069194
BUILT ENVIRONMENT-BUILDING COSTS
COST MODELLING
COST PLANNING AND CONTROL
DESIGN AND BUILD
RICS EDUCATION TRUST
690.23
A report on research funded by the Education Trust of the Royal Institution of Chartered Surveyors by Andrew Ross, School of the Built Environment, Liverpool John Moores University.
0854069194
BUILT ENVIRONMENT-BUILDING COSTS
COST MODELLING
COST PLANNING AND CONTROL
DESIGN AND BUILD
RICS EDUCATION TRUST
690.23