Delay and disruption in construction contracts (Record no. 114275)

MARC details
000 -LEADER
fixed length control field 02199cam a22003375a 4500
001 - CONTROL NUMBER
control field L156492
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 290512s2012 xxk f 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780414045200
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u156492
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
050 04 - LIBRARY OF CONGRESS CALL NUMBER
Classification number 692.8 $2 18
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Pickavance, Keith
245 00 - TITLE STATEMENT
Title Delay and disruption in construction contracts
250 ## - EDITION STATEMENT
Edition statement 4th ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. London
Name of publisher, distributor, etc. LLP
Date of publication, distribution, etc. 2011
300 ## - PHYSICAL DESCRIPTION
Extent lxxi, 1374p.
Dimensions 25cm.
350 ## - PRICE (NR) (BK AM CF MU VM SE) [OBSOLETE]
Price 295
505 2# - FORMATTED CONTENTS NOTE
Formatted contents note Introduction -- Risk of development -- Project procurement -- Standard form provisions for time and cost -- Notices, claims and early warnings -- Extensions of time and time at large -- Planning and scheduling -- Presentation and approval of schedules -- Revising, updating, monitoring and reporting -- Project control -- Mitigation, recovery and acceleration -- Variation and charge -- Construction records -- Cause and effect -- Forensic schedule analysis -- Float and time contingencies -- Disruption to progess and lost productivity -- concurrency, parallelism and pacing -- Total time, total loss and global claims -- Appointment -- Damages -- Settlements and dispute resolution -- Appendices.
520 ## - SUMMARY, ETC.
Summary, etc. The new edition covers each potential stage of delay and disruption from inception and risk assessment through to dispute and settlement. Updated and expanded with new sections on planning and scheduling risk, GMP, target cost, partnering and alliancing contracts, notices, pacing and total time claims, forensic schedule analysis, visualisations, settlement and dispute resolution. It also discusses at length the practice and law of proof of causation in delay and disruption related claims, in various jurisdictions. It covers the practice of change management and project control in construction and civil engineering contracts.
520 ## - SUMMARY, ETC.
Summary, etc. Supersedes third edition (ISBN 1843114267)
521 ## - TARGET AUDIENCE NOTE
Target audience note Advanced
650 24 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element SOCIETY OF CONSTRUCTION LAW DELAY AND DISRUPTION PROTOCOL
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name International
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element Dispute resolution
9 (RLIN) 6236
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element Contracts
9 (RLIN) 6232
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Burr, Andrew
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Lane, Nick
700 1# - ADDED ENTRY--PERSONAL NAME
Personal name Tyers, Claire
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Copy number Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     London London Books 25/07/2012 191.75   692.8 PIC 30077784 06/08/2019 1 191.75 06/08/2019 Book