Imperial Chemical Industries v Bovis Construction and others (Record no. 37743)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 01621cab a2200241 4500 |
| 001 - CONTROL NUMBER | |
| control field | ABS47206 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 090401t1992 xxu||||| |||| 00| 0 eng d |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | (Sirsi) u61047 |
| 041 ## - LANGUAGE CODE | |
| Language code of text/sound track or separate title | eng |
| 245 ## - TITLE STATEMENT | |
| Title | Imperial Chemical Industries v Bovis Construction and others |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Date of publication, distribution, etc. | 1992 |
| 350 ## - PRICE (NR) (BK AM CF MU VM SE) [OBSOLETE] | |
| Price | 0 |
| 490 ## - SERIES STATEMENT | |
| Series statement | Construction Industry Law Letter |
| Volume/sequential designation | 1992 CILL 776-778(3) |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | ORC 17 February 1992. This action arose out of refurbishment and reconstruction of I`s corporate headquarters. I brought proceedings against the management contractor, the architects and the consulting engineers. The essence of the case was that by reason of breach of their obligations to I by each defendant, including the failure to co-ordinate and supervise works, the works took much longer and cost much more than they should have done. No attempt was made in the schedule of claims to link any particular defendant to any particular loss. A global claim was made for the sum of £19m plus professional fees. I accepted a plea from the defendants that the claim for delay and disruption was inadequately pleaded and I was ordered to serve new particulars. This was also unsatisfactory and I was ordered to serve a Scott Schedule containing inter alia the alleged complaint, the defendant against whom the complaint was made, which clause of the agreement had been breached and the alleged fact |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | CLAIMS |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | DELAYS |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | GOBAL CLAIMS |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | SCHEDULE OF CLAIMS |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | SCOTT SCHEDULES |
| 690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN) | |
| Topical term or geographic name as entry element | BUILDING AND CONSTRUCTION-CASE LAW |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Suppress in OPAC | 0 |
| 948 ## - LOCAL PROCESSING INFORMATION (OCLC); SERIES PART DESIGNATOR (RLIN) | |
| c (OCLC) | 04/03/1997 |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | London | London | Journal article | 14/09/1999 | ABS47206 | 61047-1001 | 06/08/2019 | 1 | 06/08/2019 | Law report |