Construction costs steady. (Record no. 61774)

MARC details
000 -LEADER
fixed length control field 00769cam a2200157 4500
001 - CONTROL NUMBER
control field WB3538-05
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 000000n1999 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u102799
245 ## - TITLE STATEMENT
Title Construction costs steady.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 1999
490 ## - SERIES STATEMENT
Series statement CSM
-- Chartered Surveyor Monthly
Volume/sequential designation 9(1) September 1999, 9(1)
520 ## - SUMMARY, ETC.
Summary, etc. The latest Tender Price Index from the Building Cost Information Service (BCIS) suggests that tender prices rose by only 0.7% in the first quarter of 1999, and the cost of materials has fallen by 1.2% over the last year. Although these figures reflect the uncertainty in the construction market, a rise in demand for construction work is anticipated.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element BUILT ENVIRONMENT-BUILDING COSTS
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element BUILT ENVIRONMENT
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London News article 24/11/1999   WB3538-05 102799-1001 06/08/2019 1 06/08/2019 News article