Channel Tunnel rail link (Record no. 66560)

MARC details
000 -LEADER
fixed length control field 00852cam a2200193 4500
001 - CONTROL NUMBER
control field WB3713-39
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 000000n2001 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u111719
245 ## - TITLE STATEMENT
Title Channel Tunnel rail link
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2001
490 ## - SERIES STATEMENT
Series statement National Audit Office Press Notice
Volume/sequential designation (HC302) 28 March 2001, (3)
520 ## - SUMMARY, ETC.
Summary, etc. A report from the National Audit Office on the Channel Tunnel Rail Link has made several key points for future PFI projects. The report concludes that DETR achieved its key objectives through a restructured deal in 1998 for the Link but the complex financial arrangements agreed during the project will continue to require government support.
590 ## - LOCAL NOTE (RLIN)
Local note WB
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element CHANNEL TUNNEL RAIL LINK
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element PFI
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element NATIONAL AUDIT OFFICE REPORT
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element TRANSPORT AND COMMUNICATIONS
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London News article 29/03/2001   WB3713-39 111719-1001 06/08/2019 1 06/08/2019 News article