Community capacity-building explained (Record no. 74676)

MARC details
000 -LEADER
fixed length control field 00925cab a2200181 4500
001 - CONTROL NUMBER
control field X128314
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 041215n2004 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u128314
245 ## - TITLE STATEMENT
Title Community capacity-building explained
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2004
490 ## - SERIES STATEMENT
Series statement Regeneration and Renewal
Volume/sequential designation 10 December 2004, 2(1)
520 ## - SUMMARY, ETC.
Summary, etc. "Firm foundations" has been published by the Home Office. The report says that government will only achieve its objectives if it fully involves communities. Public servants and other major service providing organisations need to be equipped to engage better with citizens and communities. Much greater clarity is needed about community capacity-building and what it is. The report is available to download from: http://www.homeoffice.gov.uk/.
590 ## - LOCAL NOTE (RLIN)
Local note WB
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element SUSTAINABLE DEVELOPMENT
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element COMMUNITY INVOLVEMENT
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element ENVIRONMENTAL AND LAND CONSULTANCY
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London News article 16/12/2004   X128314 128314-1001 06/08/2019 1 06/08/2019 News article