Cost model (Record no. 75163)

MARC details
000 -LEADER
fixed length control field 00784cab a2200181 4500
001 - CONTROL NUMBER
control field L129544
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 050428n2005 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u129544
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title eng
110 ## - MAIN ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Davis Langdon
9 (RLIN) 4649
245 ## - TITLE STATEMENT
Title Cost model
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2005
490 ## - SERIES STATEMENT
Series statement Building
Volume/sequential designation 270(8378) 22 April 2005, 66-73(8)
520 ## - SUMMARY, ETC.
Summary, etc. Looks at the design and value drivers associated with theatre new-build and refurbishment. Includes the operational considerations and the theatre project costs. With a detailed new-build theatre cost breakdown (including regional variations) based on a scheme which has a 500 seat courtyard style auditorium and associated studio and workshop space.
590 ## - LOCAL NOTE (RLIN)
Local note IKA290405
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element BUILT ENVIRONMENT-BUILDING COSTS
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London Journal article 28/04/2005   L129544 129544-1001 06/08/2019 1 06/08/2019 Journal article