Core issues (Record no. 76592)

MARC details
000 -LEADER
fixed length control field 00985cab a2200181 4500
001 - CONTROL NUMBER
control field ##L132740
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 060306n2006 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u132740
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name McMeeken, Roxane
245 00 - TITLE STATEMENT
Title Core issues
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2006
490 #0 - SERIES STATEMENT
Series statement QS News
Volume/sequential designation 24 February 2006, 12-14(3)
520 ## - SUMMARY, ETC.
Summary, etc. The potential volume of work for the construction industry in cleaning up existing nuclear power stations and building new stations dwarfs that of other major projects such as the 2012 Olympics. This article discusses the current state of the UK nuclear industry, the likely structure of the sector in the future, the types of work likely to be available to the construction industry, where and when new nuclear power stations will be built, and whether the UK has the skills base to construct a new generation of such stations.
590 ## - LOCAL NOTE (RLIN)
Local note IKA140306
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element BUILT ENVIRONMENT-CONSTRUCTION MANAGEMENT-CONSTRUCTION PLANNING
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London Journal article 06/03/2006   L132740 132740-1001 06/08/2019 1 06/08/2019 Journal article