How to take calculated risks (Record no. 79305)

MARC details
000 -LEADER
fixed length control field 00920cab a22001935a 4500
001 - CONTROL NUMBER
control field L140605
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 071001e20070928xxk f 000 0 eng d
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u140605
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Hemsley, Andrew
245 00 - TITLE STATEMENT
Title How to take calculated risks
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2007
490 #0 - SERIES STATEMENT
Series statement Building
Volume/sequential designation 272(8499) 28 September 2007, 60-61(2)
520 ## - SUMMARY, ETC.
Summary, etc. Discusses the risks involved in choosing Construction Management (CM) as a procurement route, and looks at how these can be overcome. Advises the scope of construction management projects should be clearly defined, an independent quantity surveyor should be employed as the strategic cost manager, and the project should not be started too soon. Also looks at damages and concludes that CM should not be chosen without considering how to minimise the risks.
590 ## - LOCAL NOTE (RLIN)
Local note KA
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name United Kingdom
Chronological subdivision
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element Procurement
9 (RLIN) 6260
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London Journal article 01/10/2007   L140605 140605-1001 06/08/2019 1 06/08/2019 Journal article