Cost update (Record no. 82834)

MARC details
000 -LEADER
fixed length control field 00919cam a22001935a 4500
001 - CONTROL NUMBER
control field L151661
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 101126e20101126xxk 000 0 eng d
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u151661
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Fordham, Peter
245 00 - TITLE STATEMENT
Title Cost update
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2010
490 ## - SERIES STATEMENT
Series statement Building
Volume/sequential designation 275 (8656) 26 November 2010, 62-65(4)
520 ## - SUMMARY, ETC.
Summary, etc. Quarterly analysis of construction costs and prices based on Davis Langdon's quarterly Market Forecast; shows the upward trend of the last quarter continuing and wages pushing up; input costs higher again, construction materials above 10%, led by steel; looks at key changes; price adjustment formulae for construction; materials, executive summary, key indicators and construction industry; labour, summary, wage agreements and wage agreement summary.
590 ## - LOCAL NOTE (RLIN)
Local note KA
651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Geographic name United Kingdom
Chronological subdivision
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element BUILT ENVIRONMENT-CONSTRUCTION MARKET
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London Journal article 26/11/2010   L151661 151661-1001 06/08/2019 1 06/08/2019 Journal article