Infrastructure offshore wind (Record no. 84685)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 00728cab a22001815a 4500 |
| 001 - CONTROL NUMBER | |
| control field | L158767 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 150715e xxk 000 0 eng d |
| 035 ## - SYSTEM CONTROL NUMBER | |
| System control number | (Sirsi) u158767 |
| 041 0# - LANGUAGE CODE | |
| Language code of text/sound track or separate title | eng |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | McQuillan, Paul |
| 110 2# - MAIN ENTRY--CORPORATE NAME | |
| Corporate name or jurisdiction name as entry element | EC Harris |
| 9 (RLIN) | 4930 |
| 245 00 - TITLE STATEMENT | |
| Title | Infrastructure offshore wind |
| 490 ## - SERIES STATEMENT | |
| Series statement | Building |
| Volume/sequential designation | 281(8882) 10 July 2015, (38-43) |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | Reduced costs and the ability to attract finance are critical tot he viability of the UK wind industry, and with the government recently withdrawing onshore subsidies, thefocus on offshore has never been greater. This article is an exploration of the route to value for offshore wind. |
| 651 #4 - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME | |
| Geographic name | United Kingdom |
| Chronological subdivision | |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Carlisle, Barbra |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Suppress in OPAC | 0 |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | London | London | Journals | 15/07/2015 | L158767 | 158767-1001 | 06/08/2019 | 1 | 06/08/2019 | Journal article |