Image from Google Jackets

Standard form of building contract with contractor's design 1998 edition. Amendment 4 and guidance notes issued January 2002 : extension of time / loss and expense / advance payment

By: Series: JCT Standard Form of Building Contract With Contractor's Design 1998 Edition ; Amendment 4Publication details: London RIBA Publications 2002Description: 4p. 30cmSubject(s): LOC classification:
  • 692.8
Holdings
Item type Current library Call number Copy number Status Barcode
Reference material London Boxed set JCT 2002/9 (Browse shelf(Opens below)) 1 Available 30067991