Image from Google Jackets

Delay and disruption protocol

By: Language: English Publication details: Wantage Society of Construction Law 2002Description: 82p. ; 30cmISBN:
  • 0954383117
Subject(s): LOC classification:
  • 692.8 18
Summary: Aims to provide useful guidance on some of the current issues that arise on construction contracts, where one party wishes to recover from the other an extension of time and/or compensation for the additional time spent and the resources used to complete the project. A free PDF download is available at http://www.scl.org.uk/
Holdings
Item type Current library Call number Copy number Status Barcode
Book London Folio F692.8 SOC (Browse shelf(Opens below)) 1 Available 30069515

Aims to provide useful guidance on some of the current issues that arise on construction contracts, where one party wishes to recover from the other an extension of time and/or compensation for the additional time spent and the resources used to complete the project. A free PDF download is available at http://www.scl.org.uk/