Can the waste planning system deliver?
Language: English Series: RICS Research ReportPublication details: London RICS 2004Subject(s): LOC classification:- 614.76
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Book | Virtual Online | ONLINE PUBLICATION (Browse shelf(Opens below)) | 1 | Available | 125595-2001 |
Browsing Virtual shelves, Shelving location: Online Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | ||||||
| ONLINE PUBLICATION Council of RICS England and Wales | ONLINE PUBLICATION Twenty-first century procurement strategies analysing networks of inter-firm relationships | ONLINE PUBLICATION Regulatory Reform (Business Tenancies) (England and Wales) Order 2003 [electronic resource] | ONLINE PUBLICATION Can the waste planning system deliver? | ONLINE PUBLICATION The Pollution Prevention and Control (England and Wales) (Amendment) (No 2) Regulations 2003 | ONLINE PUBLICATION Greenhouse Gas Emissions Trading Scheme Regulations 2003 [electronic resource] | ONLINE PUBLICATION City of London office supply and demand forecasting model |
The summary and full report of research commissioned by RICS and the South East England Regional Assembly (SEERA) to examine whether the planning system is capable of delivering the required waste management structure in England and Wales. The findings show that at present the planning system is not providing enough new capacity to cope with projected increases in waste generation. View at www.rics.org/mwm.