Consultation on improving public participation provisions in environmental impact assessment regulations for energy infrastructure
Language: English Publication details: London DTI 2006Subject(s): LOC classification:- 711.1 $2 18
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Book | Virtual Online | ONLINE PUBLICATION (Browse shelf(Opens below)) | 1 | Available | 135403-2001 |
Seeks comments from developers and others on revised requirements relating to the Environmental Impact Assessment (EIA) of projects. Revisions to EIA requirements have arisen on a EU wide basis as a result of Directive 2003/35/EC, the Public Participation or Aarhus directive. This particular consultation covers proposed changes to a number of regimes administered by the DTI. Concerning power stations and overhead lines, gas transporter pipelines and commercial pipelines. Comments are to be received by 2 January 2007.