Image from Google Jackets

New timetables to speed up the appeal procedure

By: Language: English Series: Planning (for the Natural and Built Environment) ; (950) 24 June 1988, 14(1)Publication details: 1988Subject(s): Summary: Explains the new rules governing planning appeals , introduced by the Town and Country Planning (Inquiries Procedure) Rules 1988 and the Town and Country Planning (Appeals Determination by Inspector Inquiries Procedure) Rules 1988, which came into force on 7 July 1988.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS39362 (Browse shelf(Opens below)) 1 Available 16147-1001

Explains the new rules governing planning appeals , introduced by the Town and Country Planning (Inquiries Procedure) Rules 1988 and the Town and Country Planning (Appeals Determination by Inspector Inquiries Procedure) Rules 1988, which came into force on 7 July 1988.