Recycled building waste
Language: English Series: Surveyor ; 181(5318) 24 November 1994, 10(1)Publication details: 1994Subject(s): Summary: A DoE report "Managing demolition and construction wastes" (HMSO £38) suggests that in 10 years` time three-quarters of the 70m tonnes generated each year should be recycled and at least 5m tonnes a year turned into quality aggregate in the interests of sustainable development.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3045-07 (Browse shelf(Opens below)) | 1 | Available | 16226-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3045-04 Model performance bond | WB3045-05 NEC faces £2m bill | WB3045-06 NHS design guide | WB3045-07 Recycled building waste | WB3045-08 Dry ice freezes the dirt away | WB3045-09 CONDAM cost | WB3045-10 Admiration stakes |
A DoE report "Managing demolition and construction wastes" (HMSO £38) suggests that in 10 years` time three-quarters of the 70m tonnes generated each year should be recycled and at least 5m tonnes a year turned into quality aggregate in the interests of sustainable development.