Optimising procurement approaches to address "constructability" problems [electronic resource]

By: Contributor(s): Language: English Series: COBRA ; 2005Publication details: 2005Subject(s): Online resources: Summary: Discusses the effects of different procurement methods on constructability, such as those of design-bid-build, design and build, develop and construct, and management contracting. Reports that early involvement of contractors in the design stage, allowing enough time for design and tender activities increases constructability.

Discusses the effects of different procurement methods on constructability, such as those of design-bid-build, design and build, develop and construct, and management contracting. Reports that early involvement of contractors in the design stage, allowing enough time for design and tender activities increases constructability.