Optimising procurement approaches to address "constructability" problems [electronic resource]
Language: English Series: COBRA ; 2005Publication details: 2005Subject(s): Online resources: Summary: Discusses the effects of different procurement methods on constructability, such as those of design-bid-build, design and build, develop and construct, and management contracting. Reports that early involvement of contractors in the design stage, allowing enough time for design and tender activities increases constructability.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Book | Virtual Online | ONLINE PUBLICATION (Browse shelf(Opens below)) | 1 | Available | 137986-2001 |
Browsing Virtual shelves, Shelving location: Online Close shelf browser (Hides shelf browser)
Discusses the effects of different procurement methods on constructability, such as those of design-bid-build, design and build, develop and construct, and management contracting. Reports that early involvement of contractors in the design stage, allowing enough time for design and tender activities increases constructability.