Identifying the impact of supply chain delays on project completion time COBRA 2008 Construction and Building Research Conference Dublin Institute of Technology, Dublin, 4-5 September 2008 [electronic resource]

By: Contributor(s): Language: English Publication details: London RICS 2008ISBN:
  • 9781842194348
Subject(s): LOC classification:
  • 658.404 $2 18
Online resources:
Partial contents:
Introduction -- Research methods -- Conclusion -- References
Summary: Conference paper from COBRA RICS Construction and Building Research Conference. Researches the effect of construction supply chain delays on the time of completion of a project. Proper management of construction supply chains is an important factor to successful completion of a project. Uses as research method a mail survey and simulation models tested on Pertmaster Risk ExpertTM. Finds through this simulation, that when all possible chain supply delays are included, the project is delayed by 22 days, which is 20% of the project duration. Delays in material flow also brought major impact on a project. Lists the other most important causes of delays: labour flow, material flow, and information flow. Concludes that problems linked with "plant, equipment and temporary work" have the less impact on a project completion.
Holdings
Item type Current library Call number Copy number Status Barcode
Book Virtual Online ONLINE PUBLICATION (Browse shelf(Opens below)) 1 Available 145596-2001

Introduction -- Research methods -- Conclusion -- References

Conference paper from COBRA RICS Construction and Building Research Conference. Researches the effect of construction supply chain delays on the time of completion of a project. Proper management of construction supply chains is an important factor to successful completion of a project. Uses as research method a mail survey and simulation models tested on Pertmaster Risk ExpertTM. Finds through this simulation, that when all possible chain supply delays are included, the project is delayed by 22 days, which is 20% of the project duration. Delays in material flow also brought major impact on a project. Lists the other most important causes of delays: labour flow, material flow, and information flow. Concludes that problems linked with "plant, equipment and temporary work" have the less impact on a project completion.