Image from Google Jackets

Proving contractors` claims

By: Language: English Series: Building ; 261(7947) 28 June 1996, 31(1)Publication details: 1996Subject(s): Summary: The author uses case law to establish the level of detail required in construction contracts to protect parties if an extension of time is granted or when variations affect work on site.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS55458 (Browse shelf(Opens below)) 1 Available 16607-1001

The author uses case law to establish the level of detail required in construction contracts to protect parties if an extension of time is granted or when variations affect work on site.