London gets a better water supply
Language: English Series: Construction News ; (6066) 9 June 1988, 20-21(2)Publication details: 1988Subject(s): Summary: Reports on the construction of London `s ring main, the system being developed by Thames Water Authority to improve the capital`s water supplies. Modernised treatment works are being linked to the major demand centres by means of the gravity fed ring main. Describes a visit to one of the sites where tunnelling is underway.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS39435 (Browse shelf(Opens below)) | 1 | Available | 16699-1001 |
Reports on the construction of London `s ring main, the system being developed by Thames Water Authority to improve the capital`s water supplies. Modernised treatment works are being linked to the major demand centres by means of the gravity fed ring main. Describes a visit to one of the sites where tunnelling is underway.