Image from Google Jackets

London gets a better water supply

By: Language: English Series: Construction News ; (6066) 9 June 1988, 20-21(2)Publication details: 1988Subject(s): Summary: Reports on the construction of London `s ring main, the system being developed by Thames Water Authority to improve the capital`s water supplies. Modernised treatment works are being linked to the major demand centres by means of the gravity fed ring main. Describes a visit to one of the sites where tunnelling is underway.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS39435 (Browse shelf(Opens below)) 1 Available 16699-1001

Reports on the construction of London `s ring main, the system being developed by Thames Water Authority to improve the capital`s water supplies. Modernised treatment works are being linked to the major demand centres by means of the gravity fed ring main. Describes a visit to one of the sites where tunnelling is underway.