Meeting the problems of cost control systems
Language: English Series: Building Technology & Management ; 24(4) August/September 1988, 14-16(3)Publication details: 1988Subject(s): Summary: Reports on the results of research by Loughborough University on cost control and monitoring systems currently used in construction companies to compare real-life requirements of users and the theoretical aspects of cost control. The aim is to develop an improved system. References.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS39461 (Browse shelf(Opens below)) | 1 | Available | 16928-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Reports on the results of research by Loughborough University on cost control and monitoring systems currently used in construction companies to compare real-life requirements of users and the theoretical aspects of cost control. The aim is to develop an improved system. References.