Depot deployed
Language: English Series: Chartered Quantity Surveyor ; 10(11) July 1988, 24-25(2)Publication details: 1988Subject(s): Summary: Project analysis on the construction of the new highways depot at Leatherhead in Surrey.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS39472 (Browse shelf(Opens below)) | 1 | Available | 17009-1001 |
Project analysis on the construction of the new highways depot at Leatherhead in Surrey.