Image from Google Jackets

Design and construction health, safety and environment standard, March 2010 [electronic resource]

By: Language: English Publication details: London ODA 2010Edition: 4th ed., second revisionSubject(s): Online resources:
Partial contents:
Introduction -- Management of arrangements -- Pre-qualification and tendering guidance -- Design -- Construction site risk management -- Construction site management of HSandE -- Transport
Summary: The Olympic Delivery Authority (ODA) will create the Olympic Park and venues for the London 2012 Olympic Games and Paralympic Games. This is a detailed examination of the policy and standards that ODA health, safety and environmental management requires for all staff, accountable directors, stakeholders and suppliers.
Holdings
Item type Current library Call number Copy number Status Barcode
Book Virtual Online ONLINE PUBLICATION (Browse shelf(Opens below)) 1 Available 154822-2001

Introduction -- Management of arrangements -- Pre-qualification and tendering guidance -- Design -- Construction site risk management -- Construction site management of HSandE -- Transport

The Olympic Delivery Authority (ODA) will create the Olympic Park and venues for the London 2012 Olympic Games and Paralympic Games. This is a detailed examination of the policy and standards that ODA health, safety and environmental management requires for all staff, accountable directors, stakeholders and suppliers.