Image from Google Jackets

Definition of prime cost of daywork carried out under a heating, ventilation, air conditioning, refrigeration, pipework and/or domestic engineering contract

By: Language: English Series: RICS Guidance NotePublication details: BCIS London 2012Edition: 3rd edISBN:
  • 9781907196287
Subject(s): LOC classification:
  • 692.8
Summary: Provides a basis for the valuation of daywork executed under heating, ventilating, air conditioning, refrigeration, pipework and/or domestic engineering contracts.
Holdings
Item type Current library Call number Copy number Status Notes Barcode
Archive London RICS Boxes RICS 2012/18 (Browse shelf(Opens below)) 4 Available 30077323
Book London RICS Boxes RICS 2012/18 (Browse shelf(Opens below)) 1 Available 30077335
Book London RICS Boxes RICS 2012/18 (Browse shelf(Opens below)) 2 Available 30077331
News article Virtual Online SCAN (Browse shelf(Opens below)) Available Please contact [email protected] to request a digital copy

Provides a basis for the valuation of daywork executed under heating, ventilating, air conditioning, refrigeration, pipework and/or domestic engineering contracts.