Image from Google Jackets

Modelling risk impacts on schedule overrun in traditional procurement [electronic resource]

By: Contributor(s): Language: English Series: COBRA ; 2013Publication details: London RICS 2013ISBN:
  • 9781783210305
Subject(s): Summary: A paper presented at the COBRA Conference in New Delhi on 10-12 September 2013. Looks at developing model of practical use to the project manager and contract manager who need to deal with schedule overrun as risk eventuates. The objective of this study is to model risk impacts on the variance between the scheduled and actual project completion duration in traditional procurement.
Holdings
Item type Current library Call number Copy number Status Barcode
Book Virtual Online ONLINE PUBLICATION (Browse shelf(Opens below)) 1 Available 158868-2001

A paper presented at the COBRA Conference in New Delhi on 10-12 September 2013. Looks at developing model of practical use to the project manager and contract manager who need to deal with schedule overrun as risk eventuates. The objective of this study is to model risk impacts on the variance between the scheduled and actual project completion duration in traditional procurement.