Extension planned for DLR
Language: English Series: Construction News ; no 6407, 21/1/88 p3Publication details: 1988Subject(s): Summary: An interim report by London Transport consultants, Transecon indicates a need for a river crossing to the docklands . Lewisham is being considered as the most favourable option.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2404-39 (Browse shelf(Opens below)) | 1 | Available | 18620-1001 |
An interim report by London Transport consultants, Transecon indicates a need for a river crossing to the docklands . Lewisham is being considered as the most favourable option.