Cost model: offices of the future
Language: English Series: Building Procurement ; September 1996, 13-20(8)Publication details: 1996Subject(s): Summary: Detailed cost analysis of a high-tech, low-energy office. Design issues and general considerations are discussed and a detailed cost breakdown is included.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS55767 (Browse shelf(Opens below)) | 1 | Available | 18673-1001 |
Detailed cost analysis of a high-tech, low-energy office. Design issues and general considerations are discussed and a detailed cost breakdown is included.