Single page contract
Language: English Series: Contract Journal ; 362(5858) 30 January 1992, 3(1)Publication details: 1992Subject(s): Summary: Men at Work Managing director, John Bothamley, has drawn up a one page contract for a fixed price deal, based on the contractor shouldering all liability for design and construction, with no day-to-day input from an architects or a clients QS.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2805-06 (Browse shelf(Opens below)) | 1 | Available | 19614-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2805-03 Construction orders | WB2805-04 Job losses | WB2805-05 Mini-boom to follow tough 1992 | WB2805-06 Single page contract | WB2805-07 Hi-tech rewrites | WB2805-08 Timber frame return | WB2805-09 Turning up the heat |
Men at Work Managing director, John Bothamley, has drawn up a one page contract for a fixed price deal, based on the contractor shouldering all liability for design and construction, with no day-to-day input from an architects or a clients QS.