Image from Google Jackets

East Thames Corridor

Language: English Series: Independent ; 25 March 1993, 1&2 | Times ; 25 March 1993, 6 | RICS Press Release ; (PR63/93) 24 March 1993 | DoE News Release ; (206) 24 March 1993(9)Publication details: (206) 24 March 1993(9)Subject(s): Summary: The SoS for the Environment Michael Howard has announced that the original plans for the East Thames Corridor Scheme have been scaled down to a moderate level of growth. The DoE has also published draft planning guidance for the entire South-East, saying that 855,000 new homes would be needed by 2006.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2912-55 (Browse shelf(Opens below)) 1 Available 22372-1001

The SoS for the Environment Michael Howard has announced that the original plans for the East Thames Corridor Scheme have been scaled down to a moderate level of growth. The DoE has also published draft planning guidance for the entire South-East, saying that 855,000 new homes would be needed by 2006.