Gateshead MBC v SoS Environment and Northumbrian Water Group plc

Language: English Series: Property and Compensation Reports ; (1994) 67 P&CR 179-191(13)Publication details: 1994Subject(s): Summary: QBD 29 September 1993. The grant of outline planning permission for a clinical waste incinerator on appeal from N, contrary to the Inspector`s recommendations, was challenged in the courts by G. G argued that SoS`s reliance on the EPA pollution controls alone was not a lawful route for a planning decision; that the controls themselves were not shown to be sufficient in the circumstances; and the SoS had not justified his departure from the Inspector`s opinion. The court dismissed G`s application considering there to be legitimate overlap between planning and pollution control and that the SoS had presented his reasons intelligibly.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article ABS50723 (Browse shelf(Opens below)) 1 Available 24314-1001

QBD 29 September 1993. The grant of outline planning permission for a clinical waste incinerator on appeal from N, contrary to the Inspector`s recommendations, was challenged in the courts by G. G argued that SoS`s reliance on the EPA pollution controls alone was not a lawful route for a planning decision; that the controls themselves were not shown to be sufficient in the circumstances; and the SoS had not justified his departure from the Inspector`s opinion. The court dismissed G`s application considering there to be legitimate overlap between planning and pollution control and that the SoS had presented his reasons intelligibly.