New Austrian method
Language: English Series: Financial Times ; 4 November 1994, 8(2)Publication details: 1994Subject(s): Summary: Discusses the risks involved in the New Austrian Tunnelling Method and highlights projects that have used the system internationally. Indicates that London Underground may stop using the method for the Jubilee Line extension because of safety considerations.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3041-04 (Browse shelf(Opens below)) | 1 | Available | 25105-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3041-01 New arbitration scheme | WB3041-02 Construction workload | WB3041-03 Cost a deterrent to construction | WB3041-04 New Austrian method | WB3041-05 NHS trusts | WB3041-06 Plans for schools shelved | WB3041-07 Ready furnished housing |
Discusses the risks involved in the New Austrian Tunnelling Method and highlights projects that have used the system internationally. Indicates that London Underground may stop using the method for the Jubilee Line extension because of safety considerations.