Problems affecting contractors liability for liquidated damages
Language: English Series: Civil Engineering Surveyor ; 11(7) September 1986, 12-13(2)Publication details: 1986Subject(s): Summary: Considers the date a contractor becomes liable to deduction of liquidated damages.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS36816 (Browse shelf(Opens below)) | 1 | Available | 443-1001 |
Considers the date a contractor becomes liable to deduction of liquidated damages.