Image from Google Jackets

Problems affecting contractors liability for liquidated damages

By: Language: English Series: Civil Engineering Surveyor ; 11(7) September 1986, 12-13(2)Publication details: 1986Subject(s): Summary: Considers the date a contractor becomes liable to deduction of liquidated damages.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS36816 (Browse shelf(Opens below)) 1 Available 443-1001

Considers the date a contractor becomes liable to deduction of liquidated damages.