Image from Google Jackets

An entitlement to remain on site?

By: Language: English Series: Contract Journal ; 350(5728) 27 July 1989, 7(1)Publication details: 1989Subject(s): Summary: With reference to case law, this article examines whether a contractor is entitled to remain on site when a contract is determined or forfeited.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS41072 (Browse shelf(Opens below)) 1 Available 28024-1001

With reference to case law, this article examines whether a contractor is entitled to remain on site when a contract is determined or forfeited.