Arctic weather on the job
Language: English Series: Financial Times ; 20 April 1994, 20(2)Publication details: 1994Subject(s): Summary: Analyses whether building designers have overestimated air-conditioning needs. Includes a table of power demands in the office.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3015-12 (Browse shelf(Opens below)) | 1 | Available | 30203-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3015-09 Cavity insulation | WB3015-10 High alumina cement | WB3015-11 Trend towards fire-engineering | WB3015-12 Arctic weather on the job | WB3015-13 Chelsfield plans spending spree | WB3015-14 Disaster centre for City banks | WB3015-15 Low returns |
Analyses whether building designers have overestimated air-conditioning needs. Includes a table of power demands in the office.