Image from Google Jackets

Novated contracts: problems and benefits

By: Contributor(s): Language: English Series: CSM (Chartered Surveyor Monthly) ; 4(1) October 1994, 18-19(2)Publication details: 1994Subject(s): Summary: As design and build contracts grow in popularity, so a number of hybrid variants have emerged. One of these, `develop and construct`, is explained here and discussed in relation to another emerging trend, that of novation.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS51493 (Browse shelf(Opens below)) 1 Available 30230-1001

As design and build contracts grow in popularity, so a number of hybrid variants have emerged. One of these, `develop and construct`, is explained here and discussed in relation to another emerging trend, that of novation.