Image from Google Jackets

Cost model City of London office blocks

By: Language: English Series: Building ; 259(7864) 14 October 1994, 42-48(7)Publication details: 1994Subject(s): Summary: Takes a typical office in the City of London and tabulates costs for each stage of the building process: funding; design; procurement; and construction. A detailed cost build-up is given and a project timetable.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS51495 (Browse shelf(Opens below)) 1 Available 30316-1001

Takes a typical office in the City of London and tabulates costs for each stage of the building process: funding; design; procurement; and construction. A detailed cost build-up is given and a project timetable.