Image from Google Jackets

Sitework

Language: English Series: Building ; 251 (51/52) 19/26 December 1986, 49-56 (8)Publication details: 1986Subject(s): Summary: A special feature on sitework which outlines the steps which need to be taken when building on secondhand land. 1) Underground clean up. A. McIntyre describes the remedial action needed to reclaim contaminated land . 50-51 (2). 2. Good vibrations. M. Singleton looks at the development of the vibro replacement system for the preparation of derelict sites. 52-53 (2). 3. Doing the groundwork. G. Atkinson examines the problems caused by foundation failures. 54 (1). 4.Unseen pitfalls. E. James stresses the importance of site surveying on poor or unsure ground. 55 (1). 5. Products review. 56 (1).
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS37267 (Browse shelf(Opens below)) 1 Available 3364-1001

A special feature on sitework which outlines the steps which need to be taken when building on secondhand land. 1) Underground clean up. A. McIntyre describes the remedial action needed to reclaim contaminated land . 50-51 (2). 2. Good vibrations. M. Singleton looks at the development of the vibro replacement system for the preparation of derelict sites. 52-53 (2). 3. Doing the groundwork. G. Atkinson examines the problems caused by foundation failures. 54 (1). 4.Unseen pitfalls. E. James stresses the importance of site surveying on poor or unsure ground. 55 (1). 5. Products review. 56 (1).